The whole Beginner level is free. Intermediate and Professional unlock for a one-time $29 each.
Sign up free
⏱ About 2 min read
Most bad mornings start with a rushed opening. Follow the same order every day.
1. Switch on early. Turn the machine on at least 30–45 minutes before the first customer. Many machines have a timer that does this for you — ask if yours does.
2. Check the basics. Drip tray in place and empty, knock box empty, cups on the cup warmer, cloths ready (wand cloth, portafilter cloth, counter cloth).
3. Lock in every portafilter. They heat up with the group. A cold portafilter = a cold, sour shot.
4. Wait for ready. The heating light goes off, the steam gauge reaches about 1.0–1.5 bar. Then give it another 15–20 minutes for the metal to fully warm.
5. Flush each group for 3–5 seconds using the continuous button.
6. Purge each steam wand for 2–3 seconds. The first steam of the day is wet.
7. Set up the grinder. Fill the hopper with only what you need for the morning, purge a few grams, and check the grind with a test shot.
8. Pull a test shot on every group. Taste it, weigh it, time it. The first shot is never served.
9. Write the opening log: time, gauge readings, test shot weight and time, your initials.
0 of 6 steps done
Gauge
Good: Needle steady in the green zone
Problem: Needle swinging or out of range
Group head
Good: Even water flow on flush
Problem: Spitting, dripping or water leaking around the gasket
Steam
Good: Dry, powerful steam after purge
Problem: Weak or very wet steam
Sound
Good: Pump hums only while brewing
Problem: Grinding, rattling or a pump that won't stop
A café kept getting complaints about the first coffees of the day. The opener was skipping test shots. Once the first shot was always tasted and thrown away, the complaints stopped.
Stick the opening checklist inside a cupboard door at eye level. On a sleepy morning you'll follow the list instead of your memory.